SkyBridge Perth Western Australia
XTA | 2.0 RECESSED
Skybridge is the $31 million 280-metre walkway bridge forming part of the new METRONET Perth Airport infrastructure.
The XTA | 2.0 Recessed profile was chosen to address the concerns of high ambient temperatures. Xeramix LED chips are tested to 50-degree ambient temperature and offer a 100,000 hours L90 B10 specification.
Key Contractors
Builder- Gorgio
Engineer- Aurecon
Contractor- Everett Smith